MPP
Training device connecting up to 4 link data terminals to create up to 4 data networks

Feature
The MPP-001 unit is designed specifically for Link 11 and Link 22 operations and allows for all terminals to be connected together in one network or a combination of smaller isolated networks.
Signal connections are made through cross-point switches, no physical cable patching is required.
Advantages
Laboratory and training device allowing links to be configured in a simulated real world environment.
The MPP-001 is an invaluable tool to enable a laboratory based network to be set up with minimal effort. MPP-002 also available.
Specifications
FUNCTIONS
L11 SLEW & CLEW
L22 Analogue and Digital
Any combination L11 or L22
Simulated 1PPS
Simulated time and position string
LMS configuration
Memory
Loop back
Front panel control
L22 Analogue and Digital
Any combination L11 or L22
Simulated 1PPS
Simulated time and position string
LMS configuration
Memory
Loop back
Front panel control
Physical
Weight 12.1Kg Height 178mm Width 480mm Length 480mmServices Available
Technical Support
Installation and Setup
Maintenance
Application Support
Hardware Support
Guaranteed Warranty